Rooms with a view

As renovations continue at our family cottage, our front door and bedroom window have now been replaced with patio doors, creating rooms with a spectacular view of the lake..

 

 

We enlisted the help of two sons and a friend to remove the old door and window, create the necessary rough-ins and install the new doors…

 

 

The process of finding, ordering and getting patio doors delivered to the cottage was a frustrating experience.  In this age of online shopping, it was next to impossible to see the doors in real life before ordering.  Due to the possible extreme weather conditions at the cottage, we wanted something more durable than the base models available at local DIY stores like Home Depot or Lowes.  Stores that specialized in patio doors could not show us any doors and were very confusing on the details of what we were trying to order.  Thanks to the manager of the Lookout Home Hardware Building Center in Plevna we were able to order doors specific to our needs and even get them delivered to the cottage.

 

 

Now that that project is complete, we plan to replace the window to the left of the patio doors, add windows to the side of the cottage, and replace the door at the side as well as the window at the back with patio doors.

When the exterior is complete, including new siding, the interior renovations begin…stay tuned!

 

Advertisements

Home renovations

Now I know what people mean when they say that home renovations always snowball.  You start off planning to renovate one area, but the plan quickly “snowballs” (gains momentum) to include other areas until you are overwhelmed (and broke). If this post sounds familiar it is because a previous post complained about RENOVATIONS at our cottage that had the same snowball effect.

On the home front, we started off by deciding to renovate our main floor powder room. Our eldest son is getting married this summer, so that was our (my) incentive.  By renovating, I mean totally gutting it, removing everything, then painting, then flooring then installing new vanity, toilet, mirror, lighting etc etc.   That was the plan, but…

When ordering flooring for this powder room we decided to add to the order so we would be able to use the same flooring in our front hallway.  This hallway, between our front, side and garage doors is a high traffic area, so we wanted something very resilient, but nice looking.  We chose a glueless “Luxury Vinyl Tile” (LVT) called Allure Ultra Locking Tile that supposedly “clicked together very easily”….

20170414_191006

The flooring arrived before the vanity, granite countertop and toilet for the bathroom, so we decided to start with the hallway before we tackled the bathroom.  The first thing we did in the hallway was remove everything from the hall closet including the shelving there.  The piles of coats, jackets, shoes and boots are now (still) in my living room and dining room….

Then came the fun job of replacing the shelving and repairing the scuffed up paint in the closet area. Repainting the whole house will come later, to match the color I chose for the bathroom walls…

20170414_171129

We used a roll out underlay on top of the subfloor to cushion the tile and prevent any imperfections in the subfloor from showing through.  (mottled gray color in first picture) Sections of this were taped together to ensure they would not shift when installing the tile.  Next, we figured out the pattern we wanted the tile to be in. (you do not want your lines to line up)  For obvious reasons, it is best to do this before you start laying the tile

I love the color, (a taupe and gray pattern) the durability and the comfort of the flooring product we chose, but it sure was a lot harder to install than we were led to believe.  Of course, our hallway is not a perfect square or rectangle (lots of indentations/obstacles) and the walls not perfectly square/straight, which meant we had to measure and cut lots of pieces to fit.  This is where the slogan “measure twice, cut once” comes in.  Fortunately, I am married to a very precise, handy-man…

 

The hallway flooring is installed and the new closet doors have arrived. (leaning against the wall in picture below)   The next step in the hallway project is to install rods and shelving, put the clothes back in and the doors on.  New baseboards, door stops, and ceiling lights will be the finishing touches…

 

On to the bathroom.  The new vanity, granite countertop, back and side splashes, as well as the sink, toilet, mirror and lights are all here, somewhere…

Stay tuned for the progress of their installation.  After that, I hope we can convince ourselves to replace the carpeting with hardwood.  The snowball is still growing and gathering momentum, while our renovation budget is shrinking, fast!